At a glance

Location

Western Australia, Australia

Type of project

Construction

Client

Hancock Prospecting and Posco/STX

Contract type

Design and Construct

Status

Completed

The "engine room" of the mine

Located 100km from the nearest town, the development enables productive administration processes, provides care for staff on site as well as vehicle maintenance and repair facilities to ensure efficient transport of product and personnel across the mine

The Roy Hill Non-Processing Infrastructure project includes the delivery of heavy and light vehicle workshops, a wash down facility, a boilermaker workshop, a tyre change facility, lube farm as well as an administration buildings and gatehouse. The facilities were completed in three stages including project design, earthworks and civil works, followed by the procurement and fabrication of structures, then on-site construction and delivery.

  • 2016 MBA Excellence in Construction Awards Winner Best Industrial Building
  • Structural Steel: Metro Lintols
  • Fit-Out: Raw Construction
  • Electrical: Peak Electrical
  • Concrete and Services: Central Systems

Project in numbers

30,000m2

gross floor area